Fabrication is underway on the bridge. The team is in the process of cutting and grinding with welding and drilling holes starting in the near future. All of the main members of the bridge have been cut to their respective lengths with the joint pieces being cut as of right now. All of the members are also ground down and the joint pieces are also in the process of getting fixed to be able to be adapted to fit the members with in them. After this process the joints will then head into welding.
Once welding is completed the members will be fitted within the finalized joints and the bolt holes will be drilled. As these pieces reach the climax of the fabrication process the bridge will be built piece by piece as they come off the fabrication line.
There is still lots of fabrication to accomplish before construction of the bridge can start as the team ramps up its fabrication time, making sure each team member is completing a step in the fabrication line to be efficient and get as much done at the same time. Keep posted as this process continues and vertical bridge construction starts very soon.
Once welding is completed the members will be fitted within the finalized joints and the bolt holes will be drilled. As these pieces reach the climax of the fabrication process the bridge will be built piece by piece as they come off the fabrication line.
There is still lots of fabrication to accomplish before construction of the bridge can start as the team ramps up its fabrication time, making sure each team member is completing a step in the fabrication line to be efficient and get as much done at the same time. Keep posted as this process continues and vertical bridge construction starts very soon.